Skip to content
BhagirathLaboratories
Bhagirath and Romit Resins teams

What we have measured, and how

Spot readings by our team, each with its date, site and photo. Independent monitoring under a written protocol is part of every pilot proposal.

Pureva

Romit Resins Pvt Ltd, July 2024

First Pureva adsorber, on the flue of a resin plant in Pali, Maharashtra. Handheld flue-gas analyser at inlet and outlet.

Flue-gas analyser at the inlet, 4 July 2024 13:44
Inlet, 4 Jul 2024 13:44
Flue-gas analyser at the outlet, 4 July 2024 13:53
Outlet, 4 Jul 2024 13:53

Spot reading, as displayed on the instrument. Not O₂-corrected.

Pureva adsorber on the flue at Romit Resins
The adsorber on the plant flue
Inauguration of the Pureva unit
Commissioning day
Bhagirath and Romit Resins teams
With the Romit Resins team
Engineers inspecting the Pureva installation
Site inspection at Romit Resins

SuVayu-Bake

Wood-fired pizza oven, 14 May 2026

First unit, on a wood-fired oven. Handheld meter at the exhaust: unit bypassed, then unit in line, six minutes apart.

from > 999 to 559 µg/m³
PM2.5 at the exhaust
14 May 2026; the meter tops out at 999; readings six minutes apart

One spot reading by our team. The next installations are measured under a written before/after protocol.

Unit bypassed Unit in line Meter with the unit bypassed Meter with the unit in line

Timeline

  1. Pureva installed at Romit Resins, Pali

    First industrial adsorber on a live flue.

  2. Top 100 Startups, Maharashtra Startup Week 2025

    Recognised by the Maharashtra State Innovation Society, Government of Maharashtra.

  3. Startup Mahakumbh, New Delhi

    Presented the adsorbent and SuVayu concept at Bharat Mandapam.

  4. SuVayu-Bake pilot in a pizzeria

    PM2.5 at the exhaust from above the meter limit to 559 µg/m³ with the unit in line.

  5. Airova home pilots and SuVayu 10K fabrication

    AC add-on prototypes in homes; the 10,000 CFM pilot tower in fabrication.

Protocol

How we run a pilot

The protocol written into every pilot proposal. One report for the host, the regulator and the sponsor.

  1. Baseline

    Unit off for the first days. Record normal pollution and peak periods at all measurement points.

  2. Controlled on/off

    Alternate operation under matched wind and traffic conditions. Measure at the intake, the discharge and at 1.5 m breathing height.

  3. Continuous run

    Assess stability, energy, noise and maintenance over the full period, typically 30 to 90 days.

  4. Independent review

    Third-party analysis of the dataset and a written scale-up recommendation against pre-agreed pass criteria.

Host or sponsor a pilot

Sites are being selected for SuVayu 10K, SuVayu 2K and the next Pureva installations. Hosts and sponsors get the full dataset and the independent report.